Monday 9 April 2012

The long drive ahead.

Tomorrow is a very early start as I have hired a van so that I can travel up to Uttoxeter and Rochdale to pick up my Bench Pillar drill, Fly press and Small forge. All round this is a 400 miles trip there and back. I've been waiting a whole week for this and i'm quite excited. I'm hoping that the weather holds out, it dosen't look good at the moment, but it is set we have a long drive ahead, three things to pick, two locations and then a drive to my hired storage where the equipment will live until I can find a place to set up shop. 

No comments:

Post a Comment